Location: Home > News Center > Common Problem
- Common Problem-

Precautions for comprehensive wiring construction

Source: 本站 | Release Date: 2021-10-25 | View: 1860
Key word: Precautions for comprehensive wiring construction

When installing wire ducts, attention should be paid to the isolation from strong wire ducts. The wiring system should avoid running parallel to strong current lines for more than 3 meters without shielding and at a distance of less than 500px. If unavoidable, shielding and isolation measures should be taken for this section of the trunking. The cable pipelines entering the furniture are lowered from the nearest ceiling trunking along the partition wall to the ground, and the pipes are drilled and buried from the ground to the furniture compartment.

1. There should be no burrs on the transition and interface of the pipe slot, and the transition of the wire slot should be smooth.

2. If the conduit exceeds two elbows, a junction box must be left.

3. The wall mounted bottom box device should be at least 30 centimeters above the ground and adhere to the same height and parallel to other bottom boxes.

4. Galvanized thin-walled steel pipes or PVC shall be used as the conduit

The software and hardware of the interconnected era are very important, but the foundation for their stable operation - the computer room - is even more important. The computer room should have high availability, high reliability, high security, scalability, and rich network resources. The following will focus on the wiring of the computer room.

1. Floor wiring: This is the most common wiring method that fully utilizes the space under the floor, but it is important to pay attention to water leakage, rodent infestation, and heat dissipation under the floor. It is also important to ensure that corresponding threading holes are drilled under each cabinet.

2. Ceiling wiring: This wiring method is particularly suitable for computer rooms that frequently require wiring, and is currently very popular. In this method, the ceiling includes various wiring power and weak current wiring, and corresponding threading holes are drilled above each cabinet. Of course, attention should also be paid to water leakage, rodent damage, and heat dissipation. During the laying process, it is mainly important to pay attention to the control of tension. For cables packaged with reels, it is recommended to arrange at least one worker at each end to cover the reels on their own pull rods. The workers at the laying end should first pre pull a portion of the cables from the reels box for the collaborators to extract at the other end of the pipeline. The pre pulled wires should not be too many to avoid multiple wires entangled and wrapped on the site.

Related Articles
Related Products

Scan Mobile

E-mail: sales@etman.cn
Copyright © 2018-2023 Etman Electric (Shanghai) Co., Ltd 沪ICP备18030476号 Legalnotice Support: EastNet 站长统计